  1、 Machine room selection

  Firstly, the installation of chillers should be carried out in a computer room with sufficient lighting and ventilation. The air quality in the computer room should also be suitable, and there should be no pollutants such as dust and smoke. In addition, the ground of the computer room should be flat and have a load-bearing capacity of no less than 500kg/m ^ 2. The computer room should be separated from the pipelines between the power distribution room, water treatment room, and chilled water system to avoid affecting the temperature of the computer room. In addition, the machine room should maintain safe ventilation and be equipped with Automatic fire suppression system and security access control system.

  2、 Installation environment

  Before installing an industrial chiller, environmental preparation work needs to be done. Firstly, the environment should be cleaned to avoid damage to equipment caused by dust, rust, etc. At the same time, the installation ground should be cleaned and marked and measured on the ground. Secondly, it is necessary to check whether the installation site allows lifting, handling, and other operations, and whether there is sufficient passage and offline space. At the same time, the import, export, and power supply of the machine should be compatible with the installation environment, supported by stable electricity, and fully consider the safety of the electrical system.

  3、 Installation steps

  1. Selection of machine position

  Firstly, select the placement location of the chiller based on the spatial layout of the computer room. To maintain the normal operation of the machine, the center of gravity should be allocated to the support area, control machine vibration, and leave sufficient space for machine operation and maintenance.

  2. Ground treatment

  Place the machine on a stable ground. The ground should be flat and smooth, and its load-bearing capacity should not be less than 500kg/m ^ 2. Mark and measure on the ground, do not simply place the equipment on the ground. Add brackets on both sides of the equipment to prevent the machine from sliding due to vibration.

  3. Connection of water pipelines

  Connect cold water and cooling water pipes according to the needs and actual requirements of the cooling system. When connecting, it is necessary to avoid pipeline vibration and ensure installation quality, such as using special brackets and other damping materials. At the same time, the joints and valves of the water pipeline should be checked for tightness to prevent dangerous situations such as water leakage.

  4. Electrical connection

  Connect the electrical wiring according to the requirements of the chiller. Attention should be paid to firmly fixing the wires in the designated direction to ensure their safety and to ensure that the wires are reinforced with the electrical system.

  5. Start testing

  After the installation is completed, perform a machine startup test. After the machine has been running for a period of time, check whether various parameters of the machine are normal, such as water flow, water pressure, voltage and current, to ensure the normal operation of the equipment.